SOHO Joint Observing Plan #14
SUMER/CDS INTENSITY CROSS-CALIBRATION
Author(s): R.A. Harrison (CDS), K. Wilhelm (SUMER)
Progress:
Draft Scheme From CDS/SUMER
Blue/Red Books
Discussion at SICWG June 13 1994
Detailed PlanMinor Revisions August 10 1994
November 4 1994
CDS ID: ICCAL
Objective: To cross-calibrate CDS and SUMER
Scientific Case: This scheme should be part of our regular calibration
programme - performed on a monthly basis at least. It makes use of common bands
between CDS-NIS, CDS-GIS and SUMER. Exposure times are fixed to provide
accuracies of better than 10% on the brighter lines. The wavelength overlaps
between CDS and SUMER and between the CDS spectrometers are given below (the
brighter lines in these ranges are listed):
- CDS-GIS/SUMER - 662-787Å: We require bright, well separated
lines. In practice, this gives us one line - Ne VIII 770.40Å. However,
the band 1524-1564Å gives supplementary information on N IV
765.14Å, Ne VIII 780.30Å.
- CDS-NIS/SUMER - 517-633Å: Again, we require bright, well
separated lines. The He I 584.33Å, Mg X 609.79Å lines are the best
for this use, though they cannot be in the same wavelength band. The bands
1150-1190Å and 1215-1255Å cover these two and will give
supplementary information on Mg X 624.94Å.
- CDS-GIS/NIS - 310-346Å: Brighter lines - Fe XIII
312.16Å, Mg VIII 313.73Å, Mg VIII 317.01Å, Fe XIII
320.80Å, Fe XV 327.02Å, Fe XIV 334.17Å, Fe XVI 335.40Å,
Si IX 341.95Å, Si IX 345.13Å.
Operating Details:
- CDS
- Phase 1: NIS, Raster area 32x240 arcsec, Slit 4x240 arcsec, 8 locations.
Exposure time = 30 seconds. Total duration = 240 sec. Line selection - He I
584.33Å, Mg X 609.79Å, 624.94Å, Fe XIII 312.16Å, Mg
VIII 313.73Å, Mg VIII 317.01Å, Fe XIII 320.80Å, Fe XV
327.02Å, Fe XIV 334.17Å, Fe XVI 335.40Å, Si IX 341.95Å,
Si IX 345.13Å - 12 lines, 21 pixels across each - 48 sec to telemeter.
Total cadence = 288 sec.
- Phase 2: GIS, Raster area 32x32 arcsec, Slit 4x4 arcsec, 64 locations.
Exposure time = 20 seconds. Total duration = 1280 sec. Extract all data
(emphasis of study is on lines listed above). Telemetry time = 13 sec. Total
cadence = 1293 sec.
- Operation: Phase 1, Phase 1, Phase 2, repeat three times - Total duration
= 112 minutes (including 20% overhead for mode changes etc...)
- SUMER
- Phase 1a: Raster area 30x300 arcsec, Slit 1x300 arcsec, 40 x 0.76 arcsec
steps, accumulate
7.5 s per step = 300 sec. Wavelength selection = 1150-1190Å.
- Phase 1b: Raster area 30x300 arcsec, Slit 1x300 arcsec, 40 x 0.76 arcsec
steps,
accumulate 7.5 s per step = 300 sec. Wavelength selection =
1215-1255Å.
- Phase 2: Raster area 30x300 arcsec, Slit 1x300 arcsec, 40 x 0.76 arcsec
steps, accumulate
over 32 seconds per step = 32 x 40 = 1280 sec. Wavelength selection
1524-1564Å.
Operation: Phase 1a, Phase 1b, Phase 2, repeat three times - Total
duration = 94 minutes.